    PM KUSUM

    • March 2, 2021
    • Posted by: OptimizeIAS Team
    • Category: DPN Topics
    No Comments

     

     

    PM KUSUM

    Subject: Welfare schemes

    Context: The Centre modified the scheme and will now provide 30 per cent of the cost of building a small solar plant (70% cost borne by state DISCOMS) to supply electricity to the agricultural feeder, which essentially supplies electricity to all the pumps in a village.

    Concept:

    Three components of PM-KUSUM

    1. 10,000 megawatts (MW) of decentralised ground mounted grid-connected renewable power plants (Component-A);
    2. Installation of 17.50 lakh standalone solar powered agriculture pumps (Component-B); and
    3. solarisation of 10 lakh grid-connected solar powered agriculture pumps (Component-C).

    About modification in scheme:

    • The modification aims at focus on solarizing agricultural feeders instead of pumps, which was focus so far and changes component 3.
    • Currently, under the scheme farmers were being provided 30 per cent subsidy from the Centre and another 30 per cent from their State government (40% by farmers) to replace their existing grid connected agricultural pumps with grid connected solar pumps.
    • Farmers were not incentivized under it as agriculture supplied to agriculture gets subsidy already.
    • In current change it is expected that the DISCOMS will see fall in procurement cost from current Rs 6 per unit to Rs 2 per unit for solar power and hence retrieve the investment in 4-5 years.
    • Or for remaining 70% cost the state can avail loans from NABARD or they can even launch tenders for these proposed solar plants and sign PPAs with winning developers
    PM KUSUM Welfare Schemes