Optimize IAS
  • Home
  • About Us
  • Courses
    • Prelims Test Series
      • LAQSHYA 2026 Prelims Mentorship
      • Prelims Test Series 2025
    • CSE Integrated Guidance 2025
      • ARJUNA PRIME 2025
    • Mains Mentorship
      • Arjuna 2026 Mains Mentorship
  • Portal Login
  • Home
  • About Us
  • Courses
    • Prelims Test Series
      • LAQSHYA 2026 Prelims Mentorship
      • Prelims Test Series 2025
    • CSE Integrated Guidance 2025
      • ARJUNA PRIME 2025
    • Mains Mentorship
      • Arjuna 2026 Mains Mentorship
  • Portal Login

Green Energy Corridor Phase ­II

  • February 28, 2023
  • Posted by: OptimizeIAS Team
  • Category: DPN Topics
No Comments

 

 

Green Energy Corridor Phase ­II

Subject : Economy

Section: Msc

Concept :

About

  • The Green Energy Corridor Project aims at synchronizing electricity produced from renewable sources, such as solar and wind, with conventional power stations in the grid.
  • Green Energy Corridor is an intra-/ inter-state transmission system which is being implemented by eight renewable rich states in India – Tamil Nadu, Rajasthan, Karnataka, Andhra Pradesh, Maharashtra, Gujarat, Himachal Pradesh and Madhya Pradesh.
  • Intra-State Transmission System is being implemented by respective State Transmission Utilities (STU) and Inter-State Transmission System is being implemented by Power Grid Corporation of India Ltd. (PGCIL).
  • The scheme will facilitate grid integration and power evacuation of about 20 GW of renewable energy (RE) projects in seven states.

Green Energy Corridor Phase 1

  • The Government of India initiated the Green Energy Corridor project in 2013.
  • It is under implementation in renewable resource rich states for the likely renewable power capacity addition during 12thFive Year Plan period.
  • The first phase of green energy corridors is under implementation in Andhra Pradesh, Gujarat, Himachal Pradesh, Karnataka, Madhya Pradesh, Maharashtra, Rajasthan and Tamil Nadu and will help supply around 20 GW of renewable energy by 2022.

Green Energy Corridor Phase 2

  • It will facilitate grid integration and power evacuation of approximately 20 GW of Renewable Energy (RE) power projects in seven States namely, Gujarat, Himachal Pradesh, Karnataka, Kerala, Rajasthan, Tamil Nadu and Uttar Pradesh.
  • The transmission systems will be created over a period of five year from Financial Year 2021-22 to 2025-26.
  • It is targeted to be set up with a total estimated cost of Rs. 12, 031 crores, and the Central Finance Assistance (CFA) will be 33% of the project cost.
  • The CFA will help in offsetting the Intra-State transmission charges and thus keep the power costs down.
  • The scheme will help in achieving the target of 450 GW installed RE capacity by 2030.

Significance:

  • It will contribute to the long-term energy security of India and will promote ecologically sustainable growth by reducing carbon footprint.
  • It will facilitate in generating large direct and indirect employment opportunities for both the skilled and unskilled personnel.
economy Green Energy Corridor Phase ­II

Recent Posts

  • Daily Prelims Notes 23 March 2025 March 23, 2025
  • Challenges in Uploading Voting Data March 23, 2025
  • Fertilizers Committee Warns Against Under-Funding of Nutrient Subsidy Schemes March 23, 2025
  • Tavasya: The Fourth Krivak-Class Stealth Frigate Launched March 23, 2025
  • Indo-French Naval Exercise Varuna 2024 March 23, 2025
  • No Mismatch Between Circulating Influenza Strains and Vaccine Strains March 23, 2025
  • South Cascade Glacier March 22, 2025
  • Made-in-India Web Browser March 22, 2025
  • Charting a route for IORA under India’s chairship March 22, 2025
  • Mar-a-Lago Accord and dollar devaluation March 22, 2025

About

If IAS is your destination, begin your journey with Optimize IAS.

Hi There, I am Santosh I have the unique distinction of clearing all 6 UPSC CSE Prelims with huge margins.

I mastered the art of clearing UPSC CSE Prelims and in the process devised an unbeatable strategy to ace Prelims which many students struggle to do.

Contact us

moc.saiezimitpo@tcatnoc

For More Details

Work with Us

Connect With Me

Course Portal
Search