Optimize IAS
  • Home
  • About Us
  • Courses
    • Prelims Test Series
      • LAQSHYA 2026 Prelims Mentorship
      • Prelims Test Series 2025
    • CSE Integrated Guidance 2025
      • ARJUNA PRIME 2025
    • Mains Mentorship
      • Arjuna 2026 Mains Mentorship
  • Portal Login
  • Home
  • About Us
  • Courses
    • Prelims Test Series
      • LAQSHYA 2026 Prelims Mentorship
      • Prelims Test Series 2025
    • CSE Integrated Guidance 2025
      • ARJUNA PRIME 2025
    • Mains Mentorship
      • Arjuna 2026 Mains Mentorship
  • Portal Login

Rashtriya Rail SanrakshaKosh

  • June 6, 2023
  • Posted by: OptimizeIAS Team
  • Category: DPN Topics
No Comments

 

 

Rashtriya Rail SanrakshaKosh

Subject: Schemes

  • Rashtriya Rail SanrakshaKosh’ has been introduced in 2017-18 for works relating to renewal, replacement, upgradation of critical safety assets under Capital segment of Budget.
  • The Fund has a corpus of ` 1 lakh crore over a period of five years, with an annual outlay of ` 20,000 crore.
  • The Fund is utilized to finance identified works under plan heads Track Renewals, Bridge Works, Signalling and Telecommunication Works, Road Safety Works of Level Crossings and Road Over/Under Bridges, Rolling Stock, Traffic Facilities, Electrical Works, Machinery and Plant, Workshops, Passenger Amenities and Training. The Fund has been introduced in 2017-18 and in the first year of its inception, an expenditure of ` 16091 crore has been incurred. An outlay of ` 20,000 crore has been allocated in Budget Estimates 2018-19 also.
  • All safety related measures are taken in full earnestness and all maintenance and other activities are carried out with the help of existing manpower, mechanized means and need based outsourcing.
  • Guidelines for operating of ‘Rashtriya Rail SanrakshaKosh (RRSK) have been issued by Ministry of Finance. These guidelines include sources of financing RRSK, definition of safety works, summary of RRSK works identified, process of identifying/preparation of action plan on safety, approval framework and monitoring framework of RRSK safety plan.
  • Planning Directorate of Railway Board has been assigned the task of regularly monitoring physical and financial progress of works funded through ‘RRSK’. In addition, an independent ‘RRSK Monitoring Committee’ has been created headed by CEO, NITI Aayog to regularly examine the RRSK performance. The RRSK progress/performance shall also be reviewed annually by the ‘Committee on Economic Affairs (CCEA).
Rashtriya Rail SanrakshaKosh Schemes

Recent Posts

  • Daily Prelims Notes 23 March 2025 March 23, 2025
  • Challenges in Uploading Voting Data March 23, 2025
  • Fertilizers Committee Warns Against Under-Funding of Nutrient Subsidy Schemes March 23, 2025
  • Tavasya: The Fourth Krivak-Class Stealth Frigate Launched March 23, 2025
  • Indo-French Naval Exercise Varuna 2024 March 23, 2025
  • No Mismatch Between Circulating Influenza Strains and Vaccine Strains March 23, 2025
  • South Cascade Glacier March 22, 2025
  • Made-in-India Web Browser March 22, 2025
  • Charting a route for IORA under India’s chairship March 22, 2025
  • Mar-a-Lago Accord and dollar devaluation March 22, 2025

About

If IAS is your destination, begin your journey with Optimize IAS.

Hi There, I am Santosh I have the unique distinction of clearing all 6 UPSC CSE Prelims with huge margins.

I mastered the art of clearing UPSC CSE Prelims and in the process devised an unbeatable strategy to ace Prelims which many students struggle to do.

Contact us

moc.saiezimitpo@tcatnoc

For More Details

Work with Us

Connect With Me

Course Portal
Search