Optimize IAS
  • Home
  • About Us
  • Courses
    • Prelims Test Series
      • LAQSHYA 2026 Prelims Mentorship
    • Mains Mentorship
      • Arjuna 2026 Mains Mentorship
    • Mains Master Notes
    • PYQ Mastery Program
  • Portal Login
    • Home
    • About Us
    • Courses
      • Prelims Test Series
        • LAQSHYA 2026 Prelims Mentorship
      • Mains Mentorship
        • Arjuna 2026 Mains Mentorship
      • Mains Master Notes
      • PYQ Mastery Program
    • Portal Login

    Gas pipeline from Kochi to Bengaluru

    • January 11, 2021
    • Posted by: OptimizeIAS Team
    • Category: DPN Topics
    No Comments

     

     

    Gas pipeline from Kochi to Bengaluru

    Subject: Economy

    Context: Prime Minister Narendra Modi dedicated to the nation the Kochi-Mangaluru natural gas pipeline of the Gail Authority of India Limited (GAIL).

    Concept:

    • It is South India’s first LNG-receiving, regasification and re-loading terminal with a capacity of five million metric tonnes per annum.
    • It will deliver liquefied natural gas (LNG) sourced from a terminal in Kochi to region.
    • It is part of the project in existence since 2007 and envisages pipelines from Kochi to Mangaluru and to Bengaluru (delayed due to protests in Kerala).
    • First phase saw laying of infrastructure in Kochi and in second phase which completed extended it to Mangaluru and work on connecting Bengaluru is going on.
    • It seeks to supply LNG to industrial and residential customers.
    economy Gas pipeline from Kochi to Bengaluru
    Footer logo
    Copyright © 2015 MasterStudy Theme by Stylemix Themes
        Search