Optimize IAS
  • Home
  • About Us
  • Courses
    • Prelims Test Series
      • LAQSHYA 2026 Prelims Mentorship
    • Mains Mentorship
      • Arjuna 2026 Mains Mentorship
  • Portal Login
    • Home
    • About Us
    • Courses
      • Prelims Test Series
        • LAQSHYA 2026 Prelims Mentorship
      • Mains Mentorship
        • Arjuna 2026 Mains Mentorship
    • Portal Login

    Production Linked Incentive (PLI) Scheme for Specialty Steel

    • July 23, 2021
    • Posted by: OptimizeIAS Team
    • Category: DPN Topics
    No Comments

     

     

    Production Linked Incentive (PLI) Scheme for Specialty Steel

    Subject: Government Schemes

    Context: Recently, the Union Cabinet has approved the Production Linked Incentive (PLI) Scheme for specialty steel.

    Concept:

    Specialty Steel

    • It is value added steel wherein normal finished steel is worked upon by way of coating, plating, heat treatment, etc to convert it into high value added steel.
    • It can be used in various strategic applications like Defence, Space, Power, apart from automobile sector, specialized capital goods etc.

    About Production Linked Incentive (PLI) Scheme for Specialty Steel

    • The duration of the scheme will be five years i.e. from 2023-24 to 2027-28.
    • The five categories of specialty steel which have been chosen in the PLI Scheme are:

    Coated/Plated Steel Products

    High Strength/Wear resistant Steel

    Specialty Rails

    Alloy Steel Products and Steel wires

    Electrical Steel

    • There are 3 slabs of PLI incentives, the lowest being 4 % and highest being 12% which has been provided for electrical steel (CRGO).
    • Any company registered in India, engaged in manufacturing of the identified ‘specialty steel’ grades eligible to participate.
    Government Schemes Production Linked Incentive (PLI) Scheme for Specialty Steel
    Footer logo
    Copyright © 2015 MasterStudy Theme by Stylemix Themes
        Search