Project 75 I
- January 26, 2023
- Posted by: OptimizeIAS Team
- Category: DPN Topics
No Comments
Project 75 I
Context: Speculation abounds that the Indian Navy could cancel Project75 India (I)class for submarine product
About the Project 75:
- This project envisages the indigenous construction of submarines equipped with a state-of-the-art Air Independent Propulsion system at an estimated cost of Rs. 43,000 crores.
- Project 75 (I), approved in 2007, is part of the Indian Navy’s 30-year Plan for indigenous submarine construction.
- It will be the first under the strategic partnership model which was promulgated in 2017 to boost indigenous defence manufacturing.
- The strategic partnership model allows domestic defence manufacturers to join hands with leading foreign defence majors to produce high-end military platforms to reduce import dependence.
- Acquisitions under the Strategic Partnership model refer to the participation of private Indian firms along with foreign OEM (Original Equipment Manufacturers) in ‘Make in India’ in defence.
About 30-year Submarine Plan:
- The Cabinet Committee on Security, in June 1999, had approved a 30-year submarine-building plan which included the construction of 24 conventional submarines indigenously by 2030.
- P75I succeeded the P75 under which six diesel-electric attack submarines of the Kalvari class, based on the Scorpene class, were being built at MDL (Mazagon Dock Limited) – the six submarines under the project are: INS Kalavari, INS Khanderi, INS Kharanj, INS Vela, INS Vagir and INS Vagsheer.
- The fifth Diesel-electric attack submarine INS Vagir is commissioned.
- Of the total 24 submarines to be built in India, six will be nuclear-powered.
- India has only one nuclear submarine, INS Arihant, at the moment.
- The INS Arighat, also a nuclear-powered ballistic missile submarine, is to be commissioned soon.
- INS Chakra, a nuclear submarine, which is taken on lease from Russia, is believed to be on its way back to the country of origin.