Optimize IAS
  • Home
  • About Us
  • Courses
    • Prelims Test Series
      • LAQSHYA 2026 Prelims Mentorship
    • Mains Mentorship
      • Arjuna 2026 Mains Mentorship
    • Mains Master Notes
    • PYQ Mastery Program
  • Portal Login
    • Home
    • About Us
    • Courses
      • Prelims Test Series
        • LAQSHYA 2026 Prelims Mentorship
      • Mains Mentorship
        • Arjuna 2026 Mains Mentorship
      • Mains Master Notes
      • PYQ Mastery Program
    • Portal Login

    SILVER LINE PROJECT KERALA

    • March 2, 2022
    • Posted by: OptimizeIAS Team
    • Category: DPN Topics
    No Comments

     

     

    SILVER LINE PROJECT KERALA

    TOPIC: Economy

    Context- The proposed 529.45-km line will link Thiruvananthapuram in the south to Kasaragod in the north, covering 11 districts through 11 stations.

    Concept-

    • The project entails building a semi high-speed railway corridor through the state linking its southern end and state capital Thiruvananthapuram with its northern end of Kasaragod.
    • KRDCL, or K-Rail, is a joint venture between the Kerala government and the Union Ministry of Railways.

     

    Why Silverline?

    • SilverLine will bring remarkable changes in local commute, by improving the travel time and quality of transportation.
    • There will be a substantial reduction in road accidents due to decongestion on roads.
    • SilverLine also provides last mile connectivity which will transform people’s perception towards public transportation.

    *** For Further information refer to DPN 22 December 2021

    economy SILVER LINE PROJECT KERALA
    Footer logo
    Copyright © 2015 MasterStudy Theme by Stylemix Themes
        Search