Bhadbhut project
- August 18, 2020
- Posted by: OptimizeIAS Team
- Category: DPN Topics
No Comments
Subject: Economy
Context:
The Gujarat government recently awarded the contract for a barrage project across Narmada river.
Concept:
- It is planned to be a 1.7-km causeway-cum-weir barrage with 90 gates, across the river Narmada, 5 km from Bhadbhut village, and 25 km from the mouth of the river, where it flows into the Gulf of Khambhat.
- The barrage will stop most of the excess water flowing out of the SardarSarovar Dam from reaching the sea and thus create a “sweet water lake” of 600 mcm (million cubic metres) on the river.
- The main purpose of the project is to prevent salinity ingress.
- The sweet water from the reservoir will aim to meet the residential and industrial water requirements of Bharuch, Ankleshwar and Dahej.
- The project is part of the larger Kalpasar Project, which entails construction of a 30-km dam across the Gulf of Khambhat between Bharuch and Bhavnagar districts. The reservoir is meant to tap the waters of the Narmada, Mahisagar and Sabarmati.