Optimize IAS
  • Home
  • About Us
  • Courses
    • Prelims Test Series
      • LAQSHYA 2026 Prelims Mentorship
    • Mains Mentorship
      • Arjuna 2026 Mains Mentorship
    • Mains Master Notes
    • PYQ Mastery Program
  • Portal Login
    • Home
    • About Us
    • Courses
      • Prelims Test Series
        • LAQSHYA 2026 Prelims Mentorship
      • Mains Mentorship
        • Arjuna 2026 Mains Mentorship
      • Mains Master Notes
      • PYQ Mastery Program
    • Portal Login

    ISRO completes key test, CE20 cryogenic engine is now human-rated for Gaganyaan missions

    • February 22, 2024
    • Posted by: OptimizeIAS Team
    • Category: DPN Topics
    No Comments

     

     

    ISRO completes key test, CE20 cryogenic engine is now human-rated for Gaganyaan missions

    Subject: Science and tech

    Section: Space tech

    Context:

    • Isro has accomplished the human rating of its cryogenic engine (CE20), which powers the cryogenic stage of the human-rated LVM3 launcher for India’s first human space flight mission Gaganyaan.

    More on news:

    • ISRO’s CE20 cryogenic engine is now human-rated for Gaganyaan missions. Rigorous testing demonstrates the engine’s mettle.
    • The CE20 engine identified for the first uncrewed flight LVM3 G1 also went through acceptance tests.
    • Human-rating refers to rating a system that is capable of safely transporting humans.
    • The final test was carried out on February 13.
    • It was the seventh in a series of vacuum ignition tests carried out at the High Altitude Test Facility at ISRO Propulsion Complex, Mahendragiri, to simulate flight conditions.

    About CE20 cryogenic engine:

    • The CE-20 is an indigenous cryogenic engine ISRO developed to use with the GSLV Mk III, now called the LVM-3, launch vehicle. 
    • It represents an improvement on the CE-7.5 cryogenic engine and is instrumental to ISRO successfully realizing its human spaceflight, a.k.a. Gaganyaan, mission.
    • The CE-20 engine uses the gas-generator cycle, which discards the exhaust from the pre-burner instead of sending it to the combustion chamber.
    • This reduces fuel efficiency but, importantly for ISRO, makes the CE-20 engine easier to build and test.
    • The CE20 engine is a vital component, serving as the powerhouse of the Cryogenic Upper Stage (CUS) responsible for propelling the upper stage (C25) of the LVM3 vehicle.
    • While the CE-7.5 engine is lighter and sports higher fuel-use efficiency, the CE-20 engine achieves a higher maximum thrust (~200 kilonewton v. 73.5 kilonewton) with a shorter burn duration.
    • It has demonstrated its capability by successfully operating at a thrust level of 19 tonnes in six successive LVM3 missions, including the Chandrayaan-2, Chandrayaan-3, and two commercial OneWeb missions.
    • The ground qualification tests for the human rating of the CE20 engine involved life demonstration tests, endurance tests, and performance assessment under nominal operating conditions as well as off-nominal conditions w.r.t thrust, mixture ratio, and propellant tank pressure.

    Updates on first unmanned Gaganyaan (G1) mission:

    • ISRO has also successfully completed the acceptance tests of the flight engine identified for the first unmanned Gaganyaan (G1) mission, tentatively scheduled for Q2 of 2024.
    • This engine will power the upper stage of the human-rated LVM3 vehicle and has a thrust capability of 19 to 22 tonnes with a specific impulse of 442.5 seconds.
    • This engine will power the upper stage of the human-rated LVM3 vehicle and has a thrust capability of 19 to 22 tonnes with a specific impulse of 442.5 seconds.

    About Gaganyaan Mission:

    • Gaganyaan is a mission by the Indian Space Research Organization (ISRO).
    • Under the Gaganyaan schedule:
      • Three flights will be sent into orbit.
      • There will be two unmanned flights and one human spaceflight.
    • The Gaganyaan system module, called the Orbital Module will have three Indian astronauts, including a woman.
    • It will circle Earth at a low-earth-orbit at an altitude of 300-400 km from earth for 5-7 days.
    • Payloads:
      • Crew module –spacecraft carrying human beings.
      • Service module –powered by two liquid propellant engines.
      • It will be equipped with emergency escape and emergency mission abort.
    • GSLV Mk III, also called the LVM-3 (Launch Vehicle Mark-3,)the three-stage heavy lift launch vehicle, will be used to launch Gaganyaan as it has the necessary payload capability.

    CE20 cryogenic engine is now human-rated for Gaganyaan missions Science and tech
    Footer logo
    Copyright © 2015 MasterStudy Theme by Stylemix Themes
        Search